MOT Type 1 Sub Base: 800kg Bulk Bag

Product Code: BAGGMOTBULK
  • Buy 3 for £50.00 (£60.00 Inc VAT) each and save 6%

Have a Question?

Our team have wealth of knowledge so why not pick their brains? Call us on 01306 770490.

Delivery Cost

Proceed to the Basket Page and use our Delivery Calculator for your order.

FREE Click & Collect

Simply proceed to the checkout and select one of our stores: Dorking (Surrey), Redhill (Surrey), East Grinstead (Sussex) and Esher (Surrey).

Related Products

20mm Ballast: 800kg Bulk Bag - from About Roofing Supplies Limited

In stock

£52.99 (£63.59 Inc VAT) £49.99 (£59.99 Inc VAT)
Coarse Sharp Sand: 800kg Bulk Bag - from About Roofing Supplies Limited

In stock

£52.99 (£63.59 Inc VAT) £50.00 (£60.00 Inc VAT)
Black Soft Building Sand: 900kg Bulk Bag - from About Roofing Supplies Limited

Lead time confirmed upon order

£175.06 (£210.07 Inc VAT)
Fine Washed Plastering Sand: 800kg Bulk Bag - from About Roofing Supplies Limited

Lead time confirmed upon order

£52.99 (£63.59 Inc VAT) £50.00 (£60.00 Inc VAT)
20mm Ballast: 25kg Bag - from About Roofing Supplies Limited

In stock

£4.15 (£4.98 Inc VAT) £3.95 (£4.74 Inc VAT)
Black Soft Building Sand: 25kg Bag - from About Roofing Supplies Limited

In stock

£6.80 (£8.16 Inc VAT) £6.50 (£7.80 Inc VAT)
Coarse Sharp Sand: 25kg Bag - from About Roofing Supplies Limited

In stock

£4.15 (£4.98 Inc VAT) £3.20 (£3.84 Inc VAT)
Soft Building Sand: 25kg Bag - from About Roofing Supplies Limited

In stock

£4.15 (£4.98 Inc VAT) £3.20 (£3.84 Inc VAT)

Details

MOT Type 1 Sub Base: 800kg Bulk Bag

An ideal sub base for driveways, paths, patios and paving.

  • Supplied in 0.85/m3 or larger bulk bags.
  • Approximate weight of 800kg.
  • When working out quantities, each bag will cover approximately 14m2, when laid at 40mm deep.

Please note that this product is accurately weighed at the time of filling the bags, however settling can take place during transit, due to dampness etc. The weight can also vary due to moisture content & loss of product can occur during transit.

Technical specification

Related Articles